Real Time Thermal Rating

Real Time Thermal Rating For Energy Transmission and Distribution Systems

Distributed Temperature Sensing (DTS) Answers for Modern Power Management IEC 60287/ 60853 Rising demand for electricity is creating the need for utilizing important transmis- sion backbones at their maximum capacity. Enormous benefits can be generated by improving utilization of existing and future installations, and this is where EN.SURE can supply valuable assistance. Based on the real…

SIGMA – Forecast On-line Monitoring Sub-system Temperature Forecasting

One of the principal factors limiting the loading of power transformers is the maximum temperature rise of the equipment as a result of its loading and the ambient conditions. High operational temperatures, will accelerating the loss of insulation life and increase the risk of failures (also as a result of the risk of bubble formation)….

SIGMA-Simulation On-Line Monitoring Sub-System Temperature Forecasting Simulation

One of the principal factors limiting the loading of power transformers is the temperature attained by the equipment, as a result of its loading and the ambient conditions. High operational temperatures, while accelerating the loss of insulation life can increase the risk of failures (for example, the risk of bubble formation). SIGMA Simulation is a…

Quick Menu

Contact Us

Unit 1 195 Kooyong Rd,
Caulfield North,
3161 VIC, Australia

Telephone: +61 (0) 430 149 665
Email: sales@martecassetsolutions.com.au